CONSTRUCTION
(March 2010)
2b - Water inlets for culvert installed at...
2b - Water inlet for culvert installed at...
2b - Shoulder fill at Turda Interchange (1)
2b - Shoulder fill at Turda Interchange (2)
2b - Drainage pipe installation at km...
2b - Drainage pipe installation at km...
2b - Drainage pipe works at km 8+320
2b - Works at deck slab at km 10+081
2b - Rebar installation on deck slab at km...
2b - Deck slab at km 9+407
2b - Finishing works at deck slab at km 9+407
2b - Formwork installation for abutment at...