  Loading and transportation of topsoil to...  
 
Earthworks and Drainage parking lot  
 
Construction of a retaining wall  
Clearing and grubbing
   
  Stockpiling of unsuitable fill material  
 
Silt fence application for erosion control  
 
Preparation of waste area at 37+500  
Preparation of fill area for testing
   
  Loading excavated material to a CAT 773  
 
General view of equipment  
 
Excavation at 36+680  
Drainage for access roads